Orange Bakery Toilet and Locker Room Renovation The Owner’s Representative for Orange Bakery, once again, selected S. C. Hondros & Associates, Inc. to provide construction services for its client in Huntersville Business Park. In this project, S. C. Hondros &...
Waste Connections - Waste Transfer Station 6,750 sf S. C. Hondros & Associates, Inc. constructed a this waste transfer station for Waste Connections using a Pre-Engineered Metal Building furnished by Nucor Building Systems. Location Monroe, NC Role S.C. Hondros...
Coroplast Tape Corporation Project Size: 40,500 s.f. The management of Coroplast Tape Corporation and their Germany based parent, Coroplast, worked closely with S. C. Hondros & Associates, Inc.’s Pre-Construction, Design, and Construction teams to upfit a 40,500...
HYDAC Expansion Project Size: 60,000 s.f. (124,500 s.f. total) Just days after the ribbon cutting for HYDAC’s Denver, North Carolina manufacturing and office building, S.C. Hondros & Associates, Inc. and HYDAC’s management began planning for the building’s...
HYDAC Project Size: 54,000 s.f. The design and construction teams at S.C. Hondros & Associates, Inc. worked closely with the local, national and international management of HYDAC, a manufacturer of hydraulic filters, accumulators, valves and cooling systems to...